### Applications

# DOT & Infrastructure

Infrastructure and transportation are the building blocks of society. Get top-rated results with consistent, high-quality concrete and repair mixes for your next job.

### Recommended Products

##### [Pro-Mix Accelerated Concrete Mix](/content/product/pro-mix-accelerated-concrete-mix/index.html)

**Advanced Performance Concrete**  
**Initial Set Time:**  
15 Minutes  
**Application Depth:**  
2" and over  
**Final Strength:**  
7,000+ PSI

##### [Pro-Mix Advanced Concrete Mix](/content/product/pro-mix-advanced-concrete-mix/index.html)

**Advanced Performance Concrete**  
**Initial Set Time:**  
1 Hour Extended Set Time  
**Application Depth:**  
1.5" and Over  
**Final Strength:**  
8,000+ PSI

##### [Fast Traffic Concrete Mix](/content/product/fast-traffic-concrete-mix/index.html)

**Advanced Performance Concrete**  
**Foot Traffic:**  
3x Faster 8 Hours  
**Application Depth:**  
2" and Over  
**Final Strength:**  
6500 PSI

##### [Pro-Mix All-Purpose Cement Mix](/content/product/pro-mix-all-purpose-cement-mix/index.html)

**Advanced Performance Concrete**  
**Initial Set Time:**  
15 Minutes  
**Application Depth:**  
Feather Edge - 4"  
**Final Strength:**  
9,000+ PSI

##### [Pro-Mix Concrete Repair](/content/product/pro-mix-concrete-repair/index.html)

**Advanced Performance Concrete**  
**Initial Set Time:**  
15 Minutes  
**Application Depth:**  
1/4" - 6"  
**Final Strength:**  
7,000+ PSI

### Related Projects

##### [Repairing Damaged Precast Concrete](/content/project-guide/repairing-damaged-precast-concrete/index.html)

##### [Repairing Industrial Beams and Columns](/content/project-guide/repairing-industrial-beams-and-columns/index.html)

##### [Repairing Broken Concrete Edges and Deep Damage](/content/project-guide/repairing-broken-concrete-edges-and-deep-damage/index.html)
